Holt Fish Pass 
Scheme details 
Client 
Land & Water 
 
JOS Value 
£310k 
 
Time 
2021 – 14 weeks 
 
Sectors 
Water - Environment 
 
Purpose 
Provide a fish pass adjacent to a weir within the River Severn 
Key Data 
45m long fish pass 
Limited access for labour, plant & materials 
Working adjacent to River Severn 
Complex shapes requiring bespoke formwork 
JOS Supply 
Labour & temporary materials. 
 
 
 
JOS worked with our Land & Water to deliver this scheme with tight access constraints adjacent to the River Severn. 
 
We delivered the works safely and flexibly working in a challenging environment susceptible to flooding to the delight of our Client. 
 
One of the significant challenges we overcame were associated with access as everything was delivered by boat in small quantities which was limited depending upon the flow rate of the river. Significant planning was required to ensure the required materials were delivered just in time for this constrained site. 
 
The intricate nature of this scheme required a significant amount of bespoke formwork to form the curves, splays and steps. The expertise from our joiners and steel fixers ensured this was delivered successfully. 
 
Further scheme details can be found at the following link: 
 